Dominion Energy Kewaunee, Inc.; Kewaunee Power Station
Exemption; issuance.
Citation: "80 FR 19697"
Document Number: "Docket No. 50-305; NRC-2015-0089"
Page Number: "19697"
"Notices"
SUMMARY: The
DATES:
ADDRESSES: Please refer to Docket ID NRC-2015-0089 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:
* Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0089. Address questions about NRC dockets to
* NRC's Agencywide Documents Access and Management System (
* NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21, One White Flint North,
FOR FURTHER INFORMATION CONTACT:
SUPPLEMENTARY INFORMATION:
By letter dated
II. Request/Action
Under 10 CFR 50.12, "Specific exemptions," DEK has requested an exemption from 10 CFR 50.54(w)(1) by a letter dated
The regulation in 10 CFR 50.54(w)(1) requires each licensee to have and maintain onsite property damage insurance to stabilize and decontaminate the reactor and reactor site in the event of an accident. The onsite insurance coverage must be either
The licensee states that the risk of an accident at a permanently shutdown and defueled reactor is much less than the risk from an operating power reactor. In addition, since reactor operation is no longer authorized at KPS, there are no events that would require the stabilization of reactor conditions after an accident. Similarly, the risk of an accident that that would result in significant onsite contamination at KPS is also much lower than the risk of such an event at operating reactors. Therefore, DEK is requesting an exemption from 10 CFR 50.54(w)(1) to reduce its onsite property damage insurance from
III. Discussion
Under 10 CFR 50.12, the Commission may, upon application by any interested person or upon its own initiative, grant exemptions from the requirements of 10 CFR part 50 when (1) the exemptions are authorized by law, will not present an undue risk to public health or safety, and are consistent with the common defense and security; and (2) any of the special circumstances listed in 10 CFR 50.12(a)(2) are present.
The financial protection limits of 10 CFR 50.54(w)(1) were established after the
These cost estimates were developed based on the spectrum of postulated accidents for an operating nuclear reactor. Those costs were derived from the consequences of a release of radioactive material from the reactor. Although the risk of an accident at an operating reactor is very low, the consequences can be large. In an operating plant, the high temperature and pressure of the reactor coolant system (RCS), as well as the inventory of relatively short-lived radionuclides, contribute to both the risk and consequences of an accident. With the permanent cessation of reactor operations at KPS and the permanent removal of the fuel from the reactor core, such accidents are no longer possible. As a result, the reactor, RCS, and supporting systems no longer operate and, therefore, have no function related to the storage of the irradiated fuel. Hence, postulated accidents involving failure or malfunction of the reactor, RCS, or supporting systems are no longer applicable.
During reactor decommissioning, the principal radiological risks are associated with the storage of spent fuel onsite. In its
The licensee provided a detailed analysis of hypothetical beyond-design-basis accidents that could result in a radiological release at KPS in its
In SECY-00-0145, "Integrated Rulemaking Plan for Nuclear Power Plant Decommissioning," dated
The licensee's analyses, as referenced in its
In the safety evaluation of the licensee's request for exemptions from certain emergency planning requirements dated
The staff's basis as to why it considers
The NRC staff has determined that the licensee's proposed reduction in onsite property damage insurance coverage to a level of
A. Authorized by Law
Under 10 CFR 50.12, the Commission may grant exemptions from the regulations in 10 CFR part 50, as the Commission determines are authorized by law. The NRC staff has determined that granting of the licensee's proposed exemption will not result in a violation of the Atomic Energy Act of 1954, or other laws, as amended. Therefore, the exemption is authorized by law.
B. No Undue Risk to Public Health and Safety
The onsite property damage insurance requirements of 10 CFR 50.54(w)(1) were established to provide financial assurance that following a significant nuclear incident, onsite conditions could be stabilized and the site decontaminated. The requirements of 10 CFR 50.54(w)(1) and the existing level of onsite insurance coverage for KPS are predicated on the assumption that the reactor is operating. However, KPS is a permanently shutdown and defueled facility. The permanently defueled status of the facility has resulted in a significant reduction in the number and severity of potential accidents, and correspondingly, a significant reduction in the potential for and severity of onsite property damage. The proposed reduction in the amount of onsite insurance coverage does not impact the probability or consequences of potential accidents. The proposed level of insurance coverage is commensurate with the reduced risk and reduced cost consequences of potential nuclear accidents at KPS. Therefore, the NRC staff concludes that granting the requested exemption will not present an undue risk to the health and safety of the public.
C. Consistent With the Common Defense and Security
The proposed exemption would not eliminate any requirements associated with physical protection of the site and would not adversely affect DEK's ability to physically secure the site or protect special nuclear material. Physical security measures at KPS are not affected by the requested exemption. Therefore, the proposed exemption is consistent with the common defense and security.
D. Special Circumstances
Under 10 CFR 50.12(a)(2)(ii), special circumstances are present if the application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule. The underlying purpose of 10 CFR 50.54(w)(1) is to provide reasonable assurance that adequate funds will be available to stabilize conditions and cover onsite cleanup costs associated with site decontamination, following an accident that results in the release of a significant amount of radiological material. Because KPS is permanently shut down and defueled, it is no longer possible for the radiological consequences of design-basis accidents or other credible events at KPS to exceed the limits of the EPA PAGs at the exclusion area boundary. The licensee has performed site-specific analyses of highly unlikely, beyond-design-basis zirconium fire accidents involving the stored irradiated fuel in the SFP. The analyses show that after
The NRC staff also finds that the licensee's proposed
Under 10 CFR 50.12(a)(2)(iii), special circumstances are present whenever compliance would result in undue hardship or other costs that are significantly in excess of those contemplated when the regulation was adopted, or that are significantly in excess of those incurred by others similarly situated.
The NRC staff concludes that if the licensee was required to continue to maintain an onsite insurance level of
The NRC staff finds that compliance with the existing rule would result in an undue hardship or other costs that are significantly in excess of those contemplated when the regulation was adopted and are significantly in excess of those incurred by others similarly situated.
Therefore, the special circumstances required by 10 CFR 50.12(a)(2)(ii) and 10 CFR 50.12(a)(2)(iii) exist.
E. Environmental Considerations
The NRC approval of the exemption to insurance or indemnity requirements belongs to a category of actions that the Commission, by rule or regulation, has declared to be a categorical exclusion, after first finding that the category of actions does not individually or cumulatively have a significant effect on the human environment. Specifically, the exemption is categorically excluded from further analysis under
Under 10 CFR 51.22(c)(25), granting of an exemption from the requirements of any regulation of Chapter I to 10 CFR is a categorical exclusion provided that (i) there is no significant hazards consideration; (ii) there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (iii) there is no significant increase in individual or cumulative public or occupational radiation exposure; (iv) there is no significant construction impact; (v) there is no significant increase in the potential for or consequences from radiological accidents; and (vi) the requirements from which an exemption is sought involve: Surety, insurance, or indemnity requirements
The Director,
Therefore, pursuant to 10 CFR 51.22(b) and 51.22(c)(25), no environmental impact statement or environmental assessment need be prepared in connection with the approval of this exemption request.
IV. Conclusions
Accordingly, the Commission has determined that, pursuant to 10 CFR 50.12(a), the exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security. Also, special circumstances are present. Therefore, the Commission hereby grants DEK an exemption from the requirements of 10 CFR 50.54(w)(1), to permit the licensee to reduce its onsite property damage insurance to a level of
The exemption is effective upon issuance.
Dated at
For the
Director,
[FR Doc. 2015-08395 Filed 4-10-15;
BILLING CODE 7590-01-P